Running Projects

4-Lane Connector – Delhi Meerut Expressway to NH-235, Uttar Pradesh
The project involves the construction of a 4-lane connector road originating from Km 50.000 of Package IV of the Delhi Meerut Expressway, one of India’s most strategically important high-speed corridors,

2-Lane Upgradation – NH-244 Khellani Kishtwar Chatroo-Khanabal Section, J&K
This project entails the construction and upgradation of a strategically vital stretch of NH-244 from Km 80.675 to Km 95.550, covering a total length of 14.875 Km, along with an

Restoration of Kopili Hydro Electric Plant – Umarangso, Assam
The Kopili Hydro Electric Project, located at Umarangso in the state of Assam, is one of the oldest and most significant hydroelectric installations in Northeast India, contributing substantially to the

ICBR Road Construction – Survansamba to Kanakspur, Arunachal Pradesh
This project involves the design and construction of a strategic road under the India-China Border Roads (ICBR) program, connecting Survansamba to Kanakspur from Chainage Km 0.000 to Km 6.550 with

Energy Dissipating Arrangement – Joshiyara Barrage, Maneri Bhali Stage-II, Uttarkashi
This project entails the construction of an Energy Dissipating Arrangement (EDA) and appurtenant works at the downstream end of the Joshiyara Barrage spillway, forming a critical component of the Maneri

Concrete Lining in HRT & Surge Shaft – Hathiari HE Project, Dehradun
The Hathiari Hydro Electric Project in District Dehradun, Uttarakhand, represents a key addition to the state’s renewable energy portfolio, and this project specifically addresses the concrete lining works within its

2-Lane Upgradation with Kandi Tunnel – Akhnoor–Poonch Road NH-144A, J&K
This project covers the rehabilitation and upgradation to a 2-lane road with paved shoulder from Km 30.000 to Km 49.150 (Design Chainage Km 30.000 to Km 46.450) on the Akhnoor–Poonch

Four-Lane Bypasses – Jagatpur Babuganj Unchahar Alapur & Sai River Bridge, NH-30, Uttar Pradesh
This project involves the construction of four-lane bypasses at Jagatpur, Babuganj, Unchahar, and Alapur, along with a major bridge across the Sai River, on the Raebareli–Prayagraj Section of NH-30 (formerly

Six-Laning of Hubli-Dharwad Bypass – NH-48, Karnataka
This project encompasses the improvement and upgradation of the existing two-lane bypass to a full six-lane divided highway from Km 403.100 to Km 433.000 (Design Chainage 402.600 to 433.200) on